Guralp-systems CMG-6T Manual de usuario Pagina 16

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 31
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 15
CMG-6T
1. Prepare a hole of 60 90 cm depth to compacted subsoil, or
down to the bedrock if possible.
2. On granite or other hard bedrock, use an angle grinder to plane
off the bedrock at the pit bottom so that it is flat and level.
Stand the instrument directly on the bedrock, and go to step 7.
3. On soft bedrock or subsoil, you should install a pier as depicted
below.
4. Pour a layer of loose, fine sand into the pit to cover the base.
The type of sand used for children's sand-pits is ideal, since the
grains are clean, dry and within a small size range. On top of
the sand, place a smooth, flat granite plinth around 20 cm
across, and shift it to compact the sand and provide a near-level
surface.
Placing a granite plinth on a sand layer increases the contact
between the ground and the plinth, and improves the
16 Issue B
Vista de pagina 15
1 2 ... 11 12 13 14 15 16 17 18 19 20 21 ... 30 31

Comentarios a estos manuales

Sin comentarios